Job Description
Relocate or install new supply and drain lines to accommodate the updated bathroom layout. Includes moving water supply lines, adjusting drain locations, installing new shut-off valves, and pressure testing all connections before wall closure.
Scope of Work
1. Review layout and mark fixture locations
2. Cut and relocate drain lines
3. Install new drain-waste-vent piping
4. Install new supply lines
5. Install shut-off valves
6. Relocate shower valve rough-in
7. Install toilet flange
8. Pressure test supply lines
9. Test drain lines
10. Obtain rough plumbing inspection