Los Angeles, CA 90019
Posted October 22, 2026
Open for Bids
Job Description
Mid-City, Los Angeles CA 90019 (rear addition + front-house remodel)
Per window/door schedule on plans; count/sizes verify at site walk. Order during framing (lead time est. 4-6 wks).
Scope of Work
Per window/door schedule on plans; count/sizes verify at site walk. Order during framing (lead time est. 4-6 wks).
Known specs: Rear addition 889 SF. Plans: KenistonMain.pdf (3J Design). WFPP = LADBS P/BC 2026-004 (S-3.00/S-3.10). Permit # not in files.
Budget: open. Bid what the work costs. Site visit required before bidding.
Project Details
Category
Windows & Doors
Location
Los Angeles, CA 90019
Bidding
Open for Bids
Posted
October 22, 2026
Bidding
Open for Bids
open
0
Bids Received
--
Days Posted
You're signed in — ready to bid?
Open the Bidroom app to submit your bid on this job in seconds.