Relocate or install new supply and drain lines to accommodate the updated bathroom layout. Includes moving water supply lines, adjusting drain locations, installing new shut-off valves, and pressure testing all connections before wall closure.
Scope of Work
1. Review layout and mark fixture locations
2. Cut and relocate drain lines
3. Install new drain-waste-vent piping
4. Install new supply lines
5. Install shut-off valves
6. Relocate shower valve rough-in
7. Install toilet flange
8. Pressure test supply lines
9. Test drain lines
10. Obtain rough plumbing inspection
Project Details
Category
Mechanical
Location
LA, CA
Bidding
Open for Bids
Posted
February 14, 2026
Bidding
Open for Bids
open
5
Bids Received
--
Days Posted
You're signed in — ready to bid?
Open the Bidroom app to submit your bid on this job in seconds.