main, san frein, ca
Posted February 5, 2026
Open for Bids
Job Description
Apply primer and two coats of moisture-resistant paint to all bathroom walls and ceiling. Install silicone caulk at all wet-area transitions including tub-to-tile, shower-to-tile, vanity-to-wall, and toilet base. Ensure clean lines and proper adhesion.
Scope of Work
1. Prep surfaces — fill holes, sand, dust
2. Apply primer to new drywall and bare surfaces
3. Apply two coats moisture-resistant paint to walls
4. Paint ceiling
5. Cut in around tile, fixtures, and trim
6. Apply silicone caulk at tub-to-tile transition
7. Caulk shower corners
8. Caulk vanity-to-wall joint
9. Caulk toilet base
10. Ensure smooth, continuous caulk lines
11. Clean up drips and residue
Project Details
Category
Finishes
Location
main, san frein, ca
Bidding
Open for Bids
Posted
February 5, 2026
Bidding
Open for Bids
open
5
Bids Received
--
Days Posted
You're signed in — ready to bid?
Open the Bidroom app to submit your bid on this job in seconds.