Sign up to bid on this project and other open jobs like itCreate Free Account
Finishes
open
Bath Multi Real - Painting & Caulking
Seattle, WA
Posted February 14, 2026
Open for Bids
Job Description
Apply primer and two coats of moisture-resistant paint to all bathroom walls and ceiling. Install silicone caulk at all wet-area transitions including tub-to-tile, shower-to-tile, vanity-to-wall, and toilet base. Ensure clean lines and proper adhesion.
Scope of Work
1. Prep surfaces — fill holes, sand, dust
2. Apply primer to new drywall and bare surfaces
3. Apply two coats moisture-resistant paint to walls
4. Paint ceiling
5. Cut in around tile, fixtures, and trim
6. Apply silicone caulk at tub-to-tile transition
7. Caulk shower corners
8. Caulk vanity-to-wall joint
9. Caulk toilet base
10. Ensure smooth, continuous caulk lines
11. Clean up drips and residue
Site visit optional: you can bid without one.
Project Details
Category
Finishes
Location
Seattle, WA
Bidding
Open for Bids
Posted
February 14, 2026
Bidding
Open for Bids
open
0
Bids Received
--
Days Posted
You're signed in — ready to bid?
Open the Bidroom app to submit your bid on this job in seconds.