123 main st, los agnglees , ca
Posted January 26, 2026
$10K - $22K
Job Description
Relocate or install new supply and drain lines to accommodate the updated bathroom layout. Includes moving water supply lines, adjusting drain locations, installing new shut-off valves, and pressure testing all connections before wall closure.
Scope of Work
1. Review layout and mark fixture locations
2. Cut and relocate drain lines
3. Install new drain-waste-vent piping
4. Install new supply lines
5. Install shut-off valves
6. Relocate shower valve rough-in
7. Install toilet flange
8. Pressure test supply lines
9. Test drain lines
10. Obtain rough plumbing inspection
Project Details
Category
Mechanical
Location
123 main st, los agnglees , ca
Budget
$10K - $22K
Posted
January 26, 2026
Project Budget
$10K - $22K
open
4
Bids Received
--
Days Posted
You're signed in — ready to bid?
Open the Bidroom app to submit your bid on this job in seconds.