Homeowners Contractors Job Board
Pricing Blog How It Works
Create Free Account
Structural Framing open

Framing, rear addition 889 SF + front reconfiguration (Mid-City 90019)

Los Angeles, CA 90019 Posted October 22, 2026 Open for Bids

Job Description

Mid-City, Los Angeles CA 90019 (rear addition + front-house remodel) Frame rear addition: PT sill, floor framing, walls, braced-wall sheathing, flat roof with parapet, hardware per WFPP; front-house reconfiguration framing. Labor (material takeoff available to share). Front-house reconfiguration extent: verify at site walk.

Scope of Work

Frame rear addition: PT sill, floor framing, walls, braced-wall sheathing, flat roof with parapet, hardware per WFPP; front-house reconfiguration framing. Labor (material takeoff available to share). Front-house reconfiguration extent: verify at site walk. Known specs: Rear addition 889 SF. Plans: [plan file withheld] (3J Design). WFPP = LADBS P/BC 2026-004 (S-3.00/S-3.10). Permit # not in files. Takeoff (final 10/13 + low-slope roof revision): ~118 LF 2x6 PT sill; floor joists 30 2x10x18 @12" + 47 2x10x12 @16"; 31 sheets 5/8" T&G subfloor; 270 precut studs; 29 sheets 15/32" wall sheathing; flat roof joists 2x10 @16" (19+19), ~85 LF parapet, 31 sheets roof sheathing; 33 anchor bolts; 40 A35, H2.5A per revision. Budget: open. Bid what the work costs. Site visit optional: you can bid without one.

Site visit optional: you can bid without one.

Project Details

Category
Structural Framing
Location
Los Angeles, CA 90019
Bidding
Open for Bids
Posted
October 22, 2026
Link copied to clipboard