Remove existing structures, flooring, walls, and fixtures
Scope of Work
1. Protect adjacent flooring and walls with plastic sheeting
2. Disconnect and cap water supply and drain connections
3. Remove existing toilet, vanity, sink, and faucet
4. Remove shower/tub unit and hardware
5. Remove wall tile, floor tile, and backer board
6. Remove drywall in wet areas down to studs
7. Inspect framing for water damage, rot, or mold
8. Remove existing electrical fixtures
9. Haul all demolition debris
10. Broom-clean and prepare for rough-in work
Project Details
Category
Prep
Location
Oakland, CA
Budget
$2K - $8K
Posted
January 24, 2026
Project Budget
$2K - $8K
open
0
Bids Received
--
Days Posted
Interested in this job?
Create a free account to submit your bid and connect with the project owner directly.