Engineer in Las Vegas, AZ.
Critical Path Llc appears in Arizona license records as an engineer based in Las Vegas, AZ. The record lists a A General Engineering license (#300265) with status “Active”.
Information sourced from public state license records — not yet verified by the business owner. Always confirm credentials before hiring.
This listing was created from public license records. The owner hasn’t claimed it yet — claim it now and we’ll build you a free professional website at bidroom.io/pro/critical-path-llc.
Contact info is revealed to anyone with a free Bidroom account. Create yours to unlock contact details across the Bidroom directory — then subscribe if you'd like to message verified pros directly inside the app.
Create a free account Or subscribe to message in-appCheck license #300265 on the Arizona ROC lookup and the BBB the day you hire; status can change after Bidroom's last import (2026-04-09).
Critical Path Llc is an engineer based in Las Vegas, Arizona. Their license classification is A.
Yes. Critical Path Llc holds Arizona ROC license #300265 (status: Active). Verify the current status on Arizona ROC before hiring.
Critical Path Llc is based in Las Vegas, AZ 89118.
Contact information (phone, email, website) is shown to anyone with a free Bidroom account. Create a free account to reveal Critical Path Llc's contact details, then subscribe if you'd like to message them in-app.
The fastest way is to post your project on Bidroom — Critical Path Llc and up to 2 other verified engineers in Las Vegas can bid on it, and every quote includes itemized pricing + a written scope of work.
Not yet. This listing was created from public Arizona license records but hasn't been claimed by the owner. The license info above is from official records, but the business hasn't confirmed its services, hours, or current availability with us yet.
Contractor vetting checklist · Cost guide · Look up this license at the state board