Critical Path Construction

Contractor in Las Vegas, NV.

Hiring a contractor in Las Vegas? Compare quotes from 3 verified contractors in your area — free, no obligation, ~60 seconds.
Get free quotes →
Unclaimed listing. Are you Critical Path Construction? Claim it free →

About this contractor

License #
0040723
License status
Active
Service area
Las Vegas, NV 89118
Phone
Sign up free to view

Information sourced from public state license records — not yet verified by the business owner. Always confirm credentials before hiring.

Is this your business?

This listing was created from public license records. The owner hasn’t claimed it yet — claim it now and we’ll build you a free professional website at bidroom.io/pro/critical-path-construction.

  • Free professional website with photos, services, and booking
  • Matched job leads in Las Vegas — no per-lead fees
  • Verified-pro badge on your profile
  • Use your own domain (yourbusiness.com) on Pro plan
Claim this profile — Free
No credit card · 60 seconds · You stay in control
← Back to Contractor in Las Vegas

🔒See Critical Path Construction's phone, email & website — free

Contact info is revealed to anyone with a free Bidroom account. Create yours to unlock contact details across our 1.6M-contractor directory — then subscribe if you'd like to message verified pros directly inside the app.

Create a free account Or subscribe to message in-app

Verify Critical Path Construction before you hire

Bidroom indexed this listing from public Nevada license records. Before signing a contract, take 2 minutes to verify the credentials yourself using the official sources below.

A valid license number on file doesn't guarantee current status. License standing can change — always verify on the state board the day you hire.

Frequently asked about Critical Path Construction

What does Critical Path Construction do?

Critical Path Construction is a contractor based in Las Vegas, Nevada.

Is Critical Path Construction licensed?

Yes. Critical Path Construction holds Nevada Contractors Board license #0040723 (status: Active). Verify the current status on Nevada Contractors Board before hiring.

Where is Critical Path Construction located?

Critical Path Construction is based in Las Vegas, NV 89118. Most contractors serve a 25–50 mile radius from their home base, but always confirm coverage before requesting a bid.

How do I contact Critical Path Construction?

Contact information (phone, email, website) is shown to anyone with a free Bidroom account. Create a free account to reveal Critical Path Construction's contact details, then subscribe if you'd like to message them in-app.

How do I get a quote from Critical Path Construction?

The fastest way is to post your project on Bidroom — Critical Path Construction and up to 2 other verified contractors in Las Vegas can bid on it, and every quote includes itemized pricing + a written scope of work.

How much does a contractor cost in Las Vegas?

Varies by scope varies is the typical range. Contractor pricing depends heavily on project size, materials, and access. Get at least 3 itemized written quotes before deciding. Local market rates in Las Vegas may run higher than this baseline.

Is Critical Path Construction verified on Bidroom?

Not yet. This listing was created from public Nevada license records but hasn't been claimed by the owner. The license info above is from official records, but the business hasn't confirmed its services, hours, or current availability with us yet.

Before you hire a contractor in Las Vegas

Quick checklist any homeowner can use — these are the 8 things that distinguish hiring well from getting burned.

1Get at least 3 written quotes

Itemized scope + materials + timeline. One quote is a guess; three is data.

2Verify the license is active

Look up the number directly on Nevada Contractors Board — not just a screenshot from the contractor.

3Request a current Certificate of Insurance

General liability AND workers' comp. Have the insurer email it directly — never accept a PDF from the contractor.

4Ask for 3 recent references

Same trade, same scope, completed in the last 12 months. Call them.

5Get a written contract

Scope, payment schedule, start & completion dates, change-order process, warranty terms.

6Never pay 100% upfront

Standard: 10–30% deposit, progress draws tied to milestones, final 10% on punch-list completion.

7Use lien waivers

Get a conditional waiver with every payment and an unconditional waiver at final payment. Protects your title.

8Confirm permits are pulled

For anything structural, electrical, plumbing, or HVAC — the contractor (not you) pulls the permit. No permit = no recourse if work fails inspection.

Skip the "find 3 contractors" homework. Post your project once. Get matched with 3 licensed contractors in Las Vegas who actually want the work. Free.
Post your project →

Contractor costs in Las Vegas, NV

Typical varies
Varies by scope

Contractor pricing depends heavily on project size, materials, and access. Get at least 3 itemized written quotes before deciding.

Ranges are national averages. Las Vegas market rates may run 10–30% higher in high-cost metros. Get itemized bids to compare apples-to-apples.

Other trades hiring in Las Vegas

Are you Critical Path Construction?Claim this profile free and we'll build you a professional website at bidroom.io/pro/critical-path-construction — photos, services, online booking, your own domain.
Claim free →