Contractor in Grand Rapids, MI · licensed in Washington.
Critical Path Management Llc appears in Washington license records as a contractor based in Grand Rapids, MI (licensed in Washington). The record lists a WA L&I Construction Contractor license (#CRITIPM858JF) with status “Active”. It is listed as valid through 2027-06-11.
Information sourced from public state license records — not yet verified by the business owner. Always confirm credentials before hiring.
This listing was created from public license records. The owner hasn’t claimed it yet — claim it now and we’ll build you a free professional website at bidroom.io/pro/critical-path-management-llc.
Contact info is revealed to anyone with a free Bidroom account. Create yours to unlock contact details across the Bidroom directory — then subscribe if you'd like to message verified pros directly inside the app.
Create a free account Or subscribe to message in-appCheck license #CRITIPM858JF on the Washington L&I lookup and the BBB the day you hire; status can change after Bidroom's last import (2026-05-04).
Critical Path Management Llc is a contractor based in Grand Rapids, Washington. Their license classification is GENERAL.
Yes. Critical Path Management Llc holds Washington L&I license #CRITIPM858JF (status: Active). Verify the current status on Washington L&I before hiring.
Critical Path Management Llc is based in Grand Rapids, MI 49504. It holds a Washington license but lists a business address in Michigan.
Contact information (phone, email, website) is shown to anyone with a free Bidroom account. Create a free account to reveal Critical Path Management Llc's contact details, then subscribe if you'd like to message them in-app.
The fastest way is to post your project on Bidroom — Critical Path Management Llc and up to 2 other verified contractors in Grand Rapids can bid on it, and every quote includes itemized pricing + a written scope of work.
Not yet. This listing was created from public Washington license records but hasn't been claimed by the owner. The license info above is from official records, but the business hasn't confirmed its services, hours, or current availability with us yet.
Contractor vetting checklist · Cost guide · Look up this license at the state board