Los Angeles, CA
Posted February 8, 2026
Open for Bids
Job Description
Overall project coordination, permit acquisition, and initial design review for the kitchen renovation.
Scope of Work
Includes initial site visit, review of existing conditions, development of preliminary design concepts (if needed), preparation and submission of necessary building permits (e.g., plumbing, electrical, minor alterations) to Los Angeles City Building and Safety Department, coordination with city inspectors, and general project oversight until rough-ins are approved. Excludes detailed architectural/structural engineering drawings beyond what's required for permits.
Project Details
Category
Permits & Inspections
Location
Los Angeles, CA
Bidding
Open for Bids
Posted
February 8, 2026
Bidding
Open for Bids
open
5
Bids Received
--
Days Posted
You're signed in — ready to bid?
Open the Bidroom app to submit your bid on this job in seconds.