Typical Kitchen Renovation: 8-12 Weeks

A full kitchen renovation typically takes 8-12 weeks from demolition to completion. Here's what to expect.

Week 1-2: Demolition and Rough Work

  • Existing cabinets, counters, and flooring removed
  • Walls opened for inspection
  • Any structural changes made
  • Dust barriers installed

Week 3-4: Rough Mechanical

  • Electrical rough-in for new outlets and lighting
  • Plumbing rough-in for sink, dishwasher, ice maker
  • HVAC adjustments if needed
  • Inspections by city

Week 5-6: Walls and Flooring

  • Drywall installed and finished
  • Painting primer coats
  • Flooring installation

Week 7-8: Cabinets and Countertops

  • Cabinet installation (2-3 days)
  • Countertop template (after cabinets)
  • Countertop fabrication (1 week)
  • Countertop installation

Week 9-10: Finish Work

  • Backsplash installation
  • Plumbing fixtures installed
  • Electrical fixtures and outlets
  • Appliance installation

Week 11-12: Final Details

  • Final paint touch-ups
  • Hardware installation
  • Final inspections
  • Walkthrough and punch list